Right to Fair Compensation Act
Provision of Infrastructure in Resettlement Areas: Section 32
Section 32 is one sentence carrying the Third Schedule on its back: in every resettlement area, the Collector shall ensure the provision of all infrastructural facilities and basic minimum amenities the Schedule specifies. The section converts a list into a duty, names the officer who owes it, and, read with Section 38, gives it a deadline. This note covers the duty's content, its bearer, its timing and its enforcement.
1. The Duty
- Universal: "in every resettlement area", the duty attaches wherever displacement produces one, whatever the project's size or the acquiring department's budget mood.
- Complete: "all infrastructural facilities and basic minimum amenities" specified in the Third Schedule, the twenty-five items, norm-referenced, with no statutory licence to pick the cheap half.
- Owned by the Collector: the section names the Collector as the ensurer, the same officer who acquires, awards and takes possession answers for the village the displaced receive, with the Administrator executing under the scheme and the Commissioner supervising and auditing above him.
- Paid by the project: the amenities are a component of the cost of acquisition; the Requiring Body funds the Schedule as it funds the compensation, and a project that cannot afford the village cannot afford the acquisition.
2. The Timing
Section 32's duty takes its clock from the Act's possession architecture: under Section 38, the monetary entitlements precede possession within the Act's short window from the award, and the infrastructural entitlements, the resettlement area's amenities, are to be completed within the Act's longer window from the award, the design being that families move into a functioning village, not a promise of one. The approved scheme adds its own time limit for implementation (Section 16), so a given acquisition carries two express deadlines and one principle: displacement and amenity are to be synchronised, and where the works genuinely need the longer window, the interim arrangements, transit accommodation, water, schooling continuity, belong in the scheme rather than in improvisation.
3. Enforcement
- Specific, pleadable defaults: because the Schedule enumerates, non-provision is never a vague grievance: the missing anganwadi, the dry taps, the school without the norms are counted defaults, raised before the Collector and the Commissioner, pressed through the project R&R Committee where one exists, and referable to the LARR Authority as part of the R&R grievance jurisdiction.
- The social audit: the Commissioner's post-implementation social audit reads performance against the Schedule item by item, and the National Monitoring Committee reviews it at the Central level, paperwork designed to make amenity failure visible, which is most of the battle.
- The writ backdrop: amenities promised in a statutory scheme and withheld after possession engage the Article 300A line as well: the taking was conditioned on the rebuilding, and courts have treated rehabilitation defaults in acquired-land projects, the Narmada litigation being the standing example, as enforceable obligations, not policy aspirations.
- For the examiner: Section 32 pairs with Section 31 as the Act's two R&R deliveries: the award (individual, monetary and particularised) and the infrastructure (collective, physical and Schedule-measured).
⚠ Key point Section 32: in every resettlement area, the Collector ensures all the Third Schedule's infrastructural facilities and basic minimum amenities, funded by the Requiring Body as part of the cost of acquisition, executed under the scheme with its own time limit, and completed within the Act's window from the award under the Section 38 architecture. Defaults are specific and pleadable, audited by the Commissioner, reviewed nationally, referable to the Authority, and backed by the constitutional principle that the taking was conditioned on the rebuilding. |
4. Related Topics and Provisions
- The Third Schedule (Topic 49): the list the duty carries
- Possession and Section 38 (Topic 61): the timing architecture
- Administrator and Commissioner (Topic 55): the execution chain
- Monitoring committees (Topic 59): the oversight layer